Building Construction

The first school building was finished in 2011 and cost 15000 dollars. First and second grades started using this in the fall of 2011. Living quarters for teachers was finished in 2012. In 2014 third and fourth grades was finished (7 by 11 meters). And in 2016 the classroom block for grades 5 and 6 (9 by 12.5 meters) was completed. The cost of finishing these last two buildings (grades 3 through 6) was roughly 16000 dollars for each building. Although the buildings were getting larger the cost stayed the same because of the struggling Malawian economy. We now plan the construction of another school block which will be (7 by 13 meters).


Configuration of School Buildings


Buildings for Higher Grades


4 Teacher Living Quarters


Student Benches (for two pupils)